Top 4 Problems on PERT | Network Analysis | Networking
List of top four problems on PERT. Example 1: A small project consisting of eight activities has the following characteristics: (i) Draw the PERT network for the project. (ii) Prepare the activity schedule for the project. (iii) Determine the critical path. (iv) If a 30- week deadline is imposed, what is the probability that the project will be finished within [...]